With the hardshell and tunnel work in the hallway room now complete, I’ve been doing lots of work in the main room. Here are some pics:
Here you can see the build up around the entrance to the South Tunnel. The plywood on top will be for the second level of track and hardshell is advancing as well…

Here’s the entrance to the South Tunnel from head on and you can see the second level work is really going well!…

Here’s the first completed section of the large tunnel to the left of the South Tunnel, in the corner of the main room. I don’t have a name for this tunnel yet, but it’s going to be very long and complicated. This section represents about 1/4 of it…

Here’s the second level build up around the completed section of tunnel in the corner of the main room. The ramp up to the second level will come up through the backdrop into the main room onto the plywood that’s now there….

To the left from the tunnel above is this second section of the same tunnel, now complete and functional.

Finally, to the left of the section above, is the start of the righthand main tunnel in the main room, which will be connected to the 2 tunnel sections above. Like I said, it’s gonna be a big tunnel when it’s done…