Archive for June, 2010

MTH L4b Mohawk Modification & more…

Sunday, June 27th, 2010

I bought my first steam engine, the MTH Premier L4b Mohawk, in late 2009. It’s a great engine but it’s always had some power issues going through multiple switches and so forth. Unless the track has just been cleaned, the 2 power rollers on the locomotive just aren’t enough to give consistent power to the engine. To fix this, I used some leftover parts from an MTH dummy engine lighting kit and added a 3rd roller onto the front truck of the tender. It worked like a charm and the engine is now running like a champ!
MTH L4b mod

Things are going a little slower on the layout right now, which is fairly typical for summer. You get busy doing all sorts of outdoor family stuff and there just isn’t as much time for the layout as there is when it’s cold or nasty out. Nevertheless, there has been some work taking place. I’m going to start shooting the next layout update video next week, so look for that on my YouTube channel in the near future.

NMRA visit and other stuff

Thursday, June 17th, 2010

So the guys from the local NMRA chapter came to visit the layout on Monday. They took a bunch of pictures to send to CTT Magazine, so hopefully they guys at CTT will like it. I’ve just finished another tunnel on the north side of the layout. I will likely start making a new layout update video end the of this month or the first week of July. Cheers!

2010 Piedmont Pilgrimage

Friday, June 11th, 2010

I got an email yesterday letting me know that my spot on the 2010 Piedmont Pilgrimage will be on Sunday, November 14th from 11AM to 3PM. So, that gives me about 5 months to get as much done on the layout as I can. I’ve got several goals I’d like to meet before the pilgrimage, so now I’ve got 5 months to meet those goals. I’ll talk more about those goals as the Pilgrimage nears.

Tunnel work this week

Tuesday, June 8th, 2010

The guys from the NMRA are coming to view the layout next Monday, so I’m working as hard as I can to get the layout as ready as possible. My main goal is to have the single track tunnel on the north side of the layout done before they get here. I think I can pull it off, but it’s gonna be close.

Mainline Completely Ballasted

Thursday, June 3rd, 2010

The mainline loop that circles the entire layout (through each room) is now 100% ballasted. :)