I’ve been asked by several people when the next layout update video will be out. It’s a little overdue, as it probably should have been out around the first week of May (going by my “every 3 months” schedule). Right now it’s looking like I will have it out at the end of June or early July at the latest. There are few reasons for the slight delay:
1. I had knee surgery in March, which slowed things down for the about a month.
2. Quite frankly, there hasn’t been enough major progress on the layout to justify a video. That’s not to say that there’s been no progress, though. There’s actually been a lot of progress but much of it has been little stuff here and there that doesn’t carry a big WOW factor with it.
By the end of June, however, there should be enough big changes that I can justify making a video. The big things going on right now are (1) tunnel work, (2) track weathering and (3) preparation for installation of the remaining backdrops on the layout.
Later!